Chargers
Nothing in this category yet. Browse all products →
What is the minimum order quantity?
Most apparel starts at 25 pieces and most drinkware at 50. The minimum for each product is shown on its card and on the product page.
How do I get my design onto a product?
Upload your logo or artwork on any product page and pick a placement. No file yet? Our team will design it for you — free mockups come back within 48 hours.
How long does production take?
Typically 3–4 weeks from approved mockup, or 4–5 weeks on orders above 1,000 units. Every product card shows its own lead time.
Can you kit and ship to multiple addresses?
Yes. We kit with inserts in custom mailers and drop ship to every recipient, or bulk ship to one location — your call.
Do you handle sampling?
We sample before every production run so you approve the real thing, not a render. Sampling is included on orders above 250 units.
Custom apparel, built to be kept.
From heavyweight tees to embroidered outerwear, Kurieo builds apparel programs that hold up to being worn. We handle strategy, design, sampling, production, kitting and shipping — so a drop arrives finished, not as a box of parts. Browse the catalog for a starting point, or bring us a brief and we will build the range around it.
